You don't have javascript enabled. Good luck with that.
Pencarian
Sudin SDA Jakpus Kebut Normalisasi Tiga Saluran PHB
.
photo Suparni - Beritajakarta.id

Three Connecting Channels in C. Jakarta Normalized

Three connecting channels in some areas, Central Jakarta began to be normalized. Besides that, some damaged sheet piles are also repaired to hinder landslide.

Its project includes sediment dredging, sheet pile repair and manhole cover repair without changing the height and channel to anticipate puddle

Central Jakarta Water Resources Sub-dept. Head, Dicky Suherlan stated his side is currently accelerating the project.

"Its project includes sediment dredging, sheet pile repair and manhole cover repair without changing the height and channel to anticipate puddle," he expressed, Thursday (5/31).

Channels of Jalan Nyiur Raya Normalized

Those channels are Tanah Tinggi XII channel (200 meters length), Sukarjo channel until Harmoni (500 meters length), and Bendungan Hilir Raya channel (500 meters length).

"Every day, we send 10-12 officers to the field. Hopefully it can be finished by the end of June," he stated.

Linked News
Popular News indeks
  1. Commission E Urges Residents to Increase Role in Preventing DHF

    access_time19-12-2024 remove_red_eye1207 personDessy Suciati
  2. Transjakarta Adjusting Service as Simpang Pramuka and Rawamangun Bus Stops Closed

    access_time18-12-2024 remove_red_eye1052 personAldi Geri Lumban Tobing
  3. Transjakarta, Telkomsel to Improve Service for Customers

    access_time19-12-2024 remove_red_eye905 personAldi Geri Lumban Tobing
  4. Acting Governor Monitors Food Stock at Kramat Jati and Cipinang Markets

    access_time19-12-2024 remove_red_eye730 personFolmer
  5. Jakarta Provincial Government Holds Christmas Carol

    access_time18-12-2024 remove_red_eye577 personDessy Suciati